Abstraction of inland water for all non-hydro power of 50m³ or more per day
Find out about the permit authorisation needed for the abstraction of inland water for all non-hydropower of more than 50m³ per day.
-
Non-Industrial Emissions Directive waste activities
Find out about the permit authorisation needed for Non-Industrial Emissions Directive waste activities.
-
Disposal or recovery of hazardous waste more than 10 tonnes per day
Find out about the permit authorisation needed for the disposal or recovery of hazardous waste more than 10 tonnes per day. This is a Schedule 20 activity.
-
Disposal of non-hazardous waste more than 50 tonnes per day
Find out about the permit authorisation needed for the disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day excluding activities covered by the Urban Waste-water Treatment Directive. This is a Schedule 20 activity.
-
Temporary storage of hazardous waste
Find out about the permit authorisation needed any activity for the temporary storage of hazardous waste not covered under [Schedule 20] paragraph 26, pending any of the activities in paragraphs 23, 24, 26 or 28 with a total capacity exceeding 50 tonnes, excluding temporary storage, pending collection, on the site where the waste is generated. This is a Schedule 20 activity.
-
Abstraction of inland water for hydro power of more than 50m³ per day
Find out about the permit authorisation needed for the abstraction from inland water for hydropower of more than 50m³ per day.
-
Manufacture of any coating material using organic solvents
Find out about the permit authorisation needed for the manufacture or formulation of any coating material (such as printing ink) likely to involve the use of 100 tonnes or more of organic solvents in any 12-month period. This is a Schedule 26 activity and may also be a Schedule 23 activity.
-
Disposal or recovery of waste by incineration or co-incineration
Find out about the permit authorisation needed for the disposal or recovery of waste in an incineration plant or co-incineration plant, for non-hazardous waste with a capacity of more than 3 tonnes per hour or for hazardous waste with a capacity exceeding 10 tonnes per day. This is a Schedule 20 activity. It may also be a Schedule 22 activity.
-
Small-scale incineration of non-hazardous and hazardous waste
Find out about the permit authorisation needed for the small-scale disposal or recovery of waste in an incineration plant or co-incineration plant, for non-hazardous waste with a capacity equal to or less than 3 tonnes per hour or for hazardous waste with a capacity equal to or less than 10 tonnes per day. This is a Schedule 26 activity. It may also be a Schedule 11 or Schedule 22 activity.
-
Reclamation, restoration or improvement of land projects more than 100,000 tonnes
Find out about the permit authorisation needed for storage and use of waste in reclamation, restoration or improvement of land projects that is greater than 100,000 tonnes.