Skip to main content

Search authorisations



Search our activity, application forms and guidance documents using filters

Search type

search type

Select search type

Activity type

activity type

Select activity type

All activities

  1. Discharge of sewage to a phosphate sensitive catchment or a freshwater loch from less than or equal to 10 domestic properties or 50 population equivalent

    Find out about the permit authorisation needed to discharge sewage from less than or equal to 10 domestic properties or 50 population equivalent (pe) in a phosphate sensitive catchment or to a freshwater loch. Phosphate sensitive catchments are the catchments of Loch Leven (Perth and Kinross Council), Lunan Lochs (Perth and Kinross Council) and Loch Flemington (Highland Council).

  2. All other engineering activities not described elsewhere

    Find out about the permit authorisation needed for all other engineering activities not described elsewhere.

  3. Engineering in the vicinity, beyond the vicinity and affecting wetlands

    Find out about the permit authorisation needed for engineering in the vicinity, beyond the vicinity and affecting wetlands.

  4. Discharge of sewage where standard conditions cannot be complied with

    Find out about the permit authorisation needed to discharge when registration standard conditions cannot be complied with.

  5. Removing asbestos from railway vehicles

    Find out about the permit authorisation needed if you carry out activities to strip asbestos from railway vehicles. This does not include stripping of asbestos while repairing a vehicle, during recovery operations or if asbestos is permanently bonded in any material. This is a Schedule 26 activity.

  6. Cremation

    Find out about the permit authorisation needed for the cremation of human remains. This is a Schedule 26 activity.

  7. All other instream or in-loch structures or all other boulder placements not otherwise described

    Find out about the permit authorisation needed to carry out installation of all other instream or in-loch structures or all other boulder placements not otherwise described.

  8. The disposal of waste sheep dip

    Find out about the permit authorisation needed for the disposal by application to vegetated land, of waste sheep dip, waste sheep cosmetic products or waste Plant Protection Products (PPPs).

  9. Bank works more than 50 metres and all other bank works not otherwise described

    This activity applies to carrying out all other bank works (including any alteration to the bank height) which are not otherwise described by other activity descriptions within the bank works section.

  10. Construction site run-off

    Find out about the permit authorisation needed for run-off from a large construction site. This is where the activity is not authorised by General Binding Rule 10D.