Search authorisations
Search
All activities
-
Finishing of asbestos products
Find out about the permit authorisation needed to carry out industrial finishing of manufactured asbestos products, including shaping, drilling or fitting, when not carried out at the same time as manufacture. This is a Schedule 26 activity.
-
Discharge from a sewage treatment works with overflows from more than 10 properties or 50 population equivalent
Find out about the permit authorisation needed to discharge sewage from a sewage treatment works with overflows to the water environment from more than 10 domestic properties or 50 population equivalent.
-
Discharge from a sewage treatment works with no overflows from more than 10 properties or 50 population equivalent
Find out about the permit authorisation needed to discharge from a sewage treatment works with no overflows from more than 10 domestic properties or 50 population equivalent (pe).
-
Incineration of animal carcasses more than 10 tonnes per day
Find out about the permit authorisation needed for the incineration of animal carcasses in an incineration or co-incineration plant, with a capacity of more than 10 tonnes per day. This is a Schedule 20 activity.
-
Incineration of waste more than 3 tonnes per hour
Find out about the permit authorisation needed for the incineration of waste in an incineration or co-incineration plant, with a capacity of more than 3 tonnes per hour. This is a Schedule 20 activity.
-
Marine pen fish farms
Find out about the permit authorisation needed for the operation of a marine pen fish farm, the discharge to the water environment of fish excreta, uneaten food and other substances and the abstraction of more than 10m³/day of seawater.
-
Discharge of all other effluent
Find out about the permit authorisation needed to carry out all other discharges not described elsewhere including the discharge of trade effluent, discharges from mines and quarries and discharges from water treatment works.