Search authorisations
Search
All activities
-
Pre-treatment or dyeing textiles
Find out about the permit authorisation needed for the pre-treatment (operations such as washing, bleaching, mercerisation) or dyeing of textile fibres or textiles where the treatment capacity exceeds 10 tonnes per day. This is a Schedule 20 activity and may also be a Schedule 23 activity.
-
Storage of substances listed in Table 1
Find out about the permit authorisation needed to carry out the storage, other than as part of another activity or in a tank for the time being forming part of a powered vehicle, of any substance listed in column 1 (Substance) of Table 1. This is a Schedule 26 activity.
-
Treatment and processing of animal or vegetable matter for food or animal feed
Find out about the permit authorisation needed for the treatment and processing of animal or vegetable matter for food or animal feed (excluding exclusively packaging). This is a Schedule 20 activity.
-
Treatment and processing of milk
Find out about the permit authorisation needed for the treatment and processing of milk only, the quantity of milk received being greater than 200 tonnes per day. This is a Schedule 20 activity.
-
Loading, handling and storage of iron ore
Find out about the the permit authorisation for loading, unloading or otherwise handling or storing of iron ore. This is a Schedule 26 activity.
-
Roasting or sintering of metal ore
Find out about the permit authorisation for roasting or sintering metal ore (including sulphide ore). This is a Schedule 20 activity.
-
Foundries
Find out about the permit authorisation for the operation of ferrous metal foundries. This is a Schedule 20 activity.
-
Processing via metallurgical, chemical, electrolytic processes or via melting
Find out about the permit authorisation for processing via metallurgical, chemical, electrolytic processes or via melting. This is a Schedule 20 activity.
-
Metal processing by various methods
Find out about the permit authorisation for processing of ferrous metals by various methods. This is a Schedule 20 activity.
-
Melting, refining and casting foundry more than 5 tonnes
Find out about the permit authorisation for melting, refining, and casting foundry more than 5 tonnes. This is a Schedule 26 activity.