Search authorisations
Search
All activities
-
Removal of sediment within open culverts, canals, lades and other artificial inland waters or within 10 metres of a bridge
Find out about the registration authorisation needed to carry out the removal of sediment from an artificial watercourse.
-
Manufacture of aggregates from waste less than or equal to 20,000 tonnes
Find out about the registration authorisation needed for the storage and treatment of inert and excavation waste in the manufacture of aggregates that is less than or equal to 20,000 tonnes.
-
Small scale construction projects less than or equal to 300 tonnes
Find out about the registration authorisation needed for the storage and use of waste in small scale construction projects that is less than or equal to 300 tonnes in a 12 month period.
-
Storage and preparation of waste (not including WEEE) for reuse
Find out about the registration authorisation you need to store and prepare waste for reuse. This includes checking, cleaning and repair of waste items so they can be reused again, but does not include waste electrical and electronic equipment (WEEE).
-
Storage and treatment of cooking oil less than or equal to 25m³
Find out about the registration authorisation you need to store and treat used cooking oil for the manufacture of biodiesel. Storage is limited to less than or equal to 25m³ of waste cooking oil at any one time.
-
Incineration of animal carcasses from 50 kgs to 10 tonnes per day
Find out about the permit authorisation needed for the incineration of animal carcasses in an incineration or co-incineration plant, with a capacity of more than 50 kilograms per hour, and equal to, or less than, 10 tonnes per day. This is a Schedule 11 activity.
-
Freshwater pen fish farms
Find out about the permit authorisation needed for the discharge of aquaculture effluent from freshwater fish farms.
-
All other crossings including bridges with piers, causeways and fords
Find out about the permit authorisation needed to carry out installation of all other crossings including bridges with piers, causeways and fords.
-
Operating impoundments in estuaries or the sea
Find out about the permit authorisation needed for the operation of all impoundments in coastal and transitional waters.
-
Combustion of fuels in installations with a total input of 50MW or more
Find out about the permit authorisation for the combustion of fuels in installations with a total rated thermal input of 50MW or more. This is a Schedule 20 activity.